HOW TO INSTALL THE TOEHOOK
Step One
Slip the Velcro strap through the small loop of the elastic extension. Pull about an inch or so through.
Step Two
Wrap the Velcro tightly around the goal skate front post, fuzzy side out, keeping the elastic extension at the front. Press the Velcro firmly in place.
Step Three
Pinch the end of the Velcro and push it through the small loop of the elastic extension. Pull tight and wrap around the post again. Press all the Velcro firmly.
Step Four
Add the cold weather zip tie through the small loop of the elastic extension and secure it tightly on top of the Velcro. Try to keep it centred. Trim the excess zip tie and slide the head back behind the post.
Step Five
Remove the laces from the toe bridge of the goalie leg pads.
Step Six
With the ToeHook facing upward, line it up with the holes vacated by the laces. Secure the ToeHook with the machine screws and the t-nuts as tight as possible.
Step Seven
To attach, slide the loop attached to the goal skate, into the Toe Hook and pull down into place. Finish securing the skate and leg pad as usual.
Step Eight
To remove, simply roll the loop over the hook and slide out.